This first section focuses on the White Fawn Reservoir access and off-road asphalt sections of greenway from the White Fawn Reservoir connections, continuing northward toward Ardmion Park.  This graphic also includes part of the connection coming from White Fawn Drive (labeled as –L3- and is continued from Detail Board 02).


 

The second section focuses on the off-road connection to Memorial Stadium, an on-road section along White Fawn Dr, and an off-road section beginning at the existing terminus of White Fawn Drive that ultimately connects to Ardmion Park.  Because of the steep grades coming up from Memorial Stadium switchbacks are necessary to achieve comfortable and accessible grades for trail users.


 

The next section focuses on the off-and road segments along Ardmion Park.  Due to limited width, the on-road section design includes sidewalk and sharrow (bicycle facility in which bicycles share the road with vehicles). Sharrows are pavement markings that alert drivers that cyclist will likely be present on the road. They do not create a separate bike lane but rather signal that the road is to be shared.


 

Lastly, the final section continues to focus on the off-road greenway segment along Ardmion Park.   The trail follows the right of way along Ardmion Park to its connection with Beaumont Street.  The on-road portion trail along the Beaumont Street and College Street is a combination of sidewalk and sharrows leading up to the Helens Bridge access. Sharrows are pavement markings that alert drivers that cyclist will likely be present on the road. They do not create a separate bike lane but rather signal that the road is to be shared.